Energy assumptions
Default energy assumptions
General
Storage To Generation Ratio: 1.5
Backup To Primary Generation ratio: The percentage of energy assumed to be generated by the backup generator as part of the total energy generation under normal operation, defaults to 20% (frequency regulation, grid stability, overall Capex)V
Generation Method Dependent
Solar PV: (at 11 degrees)
Install cost per kW: $1,800
Maximum generation per square meter: 200 kWh
One time cost: n/a
Solar PV: (at 30 degrees)
Install cost per kW: $1,800
Maximum generation per square meter: 200 kWh
One time cost: n/a
CHP/Cogen:
Install Cost per kW: $3,500
Per kWh fuel cost: $0.10
HAWT (Wind Turbine): (Horizontal Axis Wind Turbine):
Install cost per kW: $2,500
Cut in: wind speed required for the turbine to move, defaults to 3 knots
Cut out: wind speed that would cause the turbine to lock, defaults to 20 knots
Capacity: Capacity of one turbine, defaults to 1.5 MW
Blade length: Length of blade, defaults to 3.8 meters
Diesel Engine:
Install cost per kW: $1,500 (Median cost assumed between spinning and standby)
Per kWh fuel cost: 0.12
Gas Engine:
Install cost per kW: $1,500 (Median cost assumed between spinning and standby)
Per kWh fuel cost: 0.11
Propane Engine:
Install Cost per kW: $1,500 (Median cost assumed between spinning and standby)
Per kWh fuel cost: 0.11
Battery storage: